Excavation Contractors Summit

Best Excavating Contractor in Summit

Receive 3 FREE Excavation Contractors quotes for your project today! Compare profiles, reviews, accreditations, portfolio, etc... and choose the best service.

Service Needed
City or Town
Find Pros

Over 22,076+ Excavation Businesses in our network

Our excavation contractors operate in Summit and surrounding areas!

ExcavationHQ has curated and vetted the Best Excavation Pros in and around Summit. Find a top & trustworthy business today.

Frequently Asked Questions About Excavation Contractors

Find answers to common questions about excavation contractors and hiring excavation professionals in the USA.

How do I calculate how much dirt I need for fill?

To calculate the volume of dirt (fill) needed, follow these steps:
  1. Determine the Area: Measure the length and width of the area you want to fill. Multiply them to get the area in square feet (or meters).
  2. Determine the Depth: Measure the difference between the existing grade and the desired grade (how much you need to raise the ground). This is the depth of fill required.
  3. Calculate Volume: Multiply the area (step 1) by the depth (step 2) to get the volume in cubic feet (or meters).
  4. Account for Compaction: Fill dirt compacts when it settles, so add 10% to 25% to the calculated volume to account for compaction. The exact percentage depends on the type of fill material.
For complex projects or uneven terrain, consult an excavation contractor or surveyor for accurate volume calculations.

Do I need a permit for excavation?

Permit requirements for excavation vary widely depending on your location and the project's specifics. Generally, permits are needed for:
  • Excavations Deeper Than a Certain Depth: This varies by jurisdiction, usually around 5 feet.
  • Excavations Near Utilities: Digging near buried utilities (gas, water, electric) often requires permits and utility locates to prevent damage.
  • Excavations Affecting Public Property: Projects impacting sidewalks, roads, or other public areas typically require permits.
  • Excavations in Environmentally Sensitive Areas: Projects in wetlands, floodplains, or other sensitive areas might need special permits.
Contact your local building department or planning authority to determine the permit requirements for your excavation project. Failure to obtain necessary permits can result in fines or project delays.

What are the risks associated with excavation?

Excavation, while essential for many projects, involves inherent risks, including:
  • Trench Collapses: Unstable trench walls can cave in, posing a severe risk to workers. Proper shoring and sloping are crucial safety measures.
  • Utility Damage: Striking underground utilities (gas, water, electric) can cause leaks, explosions, or electrocution. Accurate utility locates and careful digging are essential.
  • Falling Objects: Materials or equipment falling into excavations can injure workers. Securing work areas and using appropriate safety gear is vital.
  • Equipment Accidents: Operating heavy machinery involves risks of rollovers, collisions, or mechanical failures. Trained operators and proper equipment maintenance are critical.
  • Environmental Hazards: Excavated soil might contain hazardous materials (asbestos, lead). Proper testing and disposal procedures are necessary.
Reputable excavation contractors prioritize safety and have protocols to mitigate these risks.

What equipment is used for excavation?

Excavation projects employ various heavy equipment, chosen based on the job's scale and complexity. Common equipment includes:
  • Excavators: Versatile machines with a bucket, arm, and rotating cab for digging, lifting, and moving earth.
  • Backhoes: Similar to excavators but with a digging bucket on the back and a loader bucket on the front, ideal for trenching and smaller excavations.
  • Bulldozers: Powerful machines with a large blade for pushing earth, clearing land, and leveling surfaces.
  • Skid Steers: Compact and maneuverable loaders with various attachments (buckets, forks) for digging, loading, and grading in tight spaces.
  • Trenchers: Specialized machines for digging narrow trenches for utilities.
  • Dump Trucks: Vehicles for hauling excavated material to disposal sites.
The choice of equipment depends on factors such as the type of excavation, soil conditions, site accessibility, and project budget.

How do I calculate how much dirt I need for fill?

To calculate the volume of dirt (fill) needed, follow these steps:
  1. Determine the Area: Measure the length and width of the area you want to fill. Multiply them to get the area in square feet (or meters).
  2. Determine the Depth: Measure the difference between the existing grade and the desired grade (how much you need to raise the ground). This is the depth of fill required.
  3. Calculate Volume: Multiply the area (step 1) by the depth (step 2) to get the volume in cubic feet (or meters).
  4. Account for Compaction: Fill dirt compacts when it settles, so add 10% to 25% to the calculated volume to account for compaction. The exact percentage depends on the type of fill material.
For complex projects or uneven terrain, consult an excavation contractor or surveyor for accurate volume calculations.

Do I need a permit for excavation?

Permit requirements for excavation vary widely depending on your location and the project's specifics. Generally, permits are needed for:
  • Excavations Deeper Than a Certain Depth: This varies by jurisdiction, usually around 5 feet.
  • Excavations Near Utilities: Digging near buried utilities (gas, water, electric) often requires permits and utility locates to prevent damage.
  • Excavations Affecting Public Property: Projects impacting sidewalks, roads, or other public areas typically require permits.
  • Excavations in Environmentally Sensitive Areas: Projects in wetlands, floodplains, or other sensitive areas might need special permits.
Contact your local building department or planning authority to determine the permit requirements for your excavation project. Failure to obtain necessary permits can result in fines or project delays.

What are the risks associated with excavation?

Excavation, while essential for many projects, involves inherent risks, including:
  • Trench Collapses: Unstable trench walls can cave in, posing a severe risk to workers. Proper shoring and sloping are crucial safety measures.
  • Utility Damage: Striking underground utilities (gas, water, electric) can cause leaks, explosions, or electrocution. Accurate utility locates and careful digging are essential.
  • Falling Objects: Materials or equipment falling into excavations can injure workers. Securing work areas and using appropriate safety gear is vital.
  • Equipment Accidents: Operating heavy machinery involves risks of rollovers, collisions, or mechanical failures. Trained operators and proper equipment maintenance are critical.
  • Environmental Hazards: Excavated soil might contain hazardous materials (asbestos, lead). Proper testing and disposal procedures are necessary.
Reputable excavation contractors prioritize safety and have protocols to mitigate these risks.

What equipment is used for excavation?

Excavation projects employ various heavy equipment, chosen based on the job's scale and complexity. Common equipment includes:
  • Excavators: Versatile machines with a bucket, arm, and rotating cab for digging, lifting, and moving earth.
  • Backhoes: Similar to excavators but with a digging bucket on the back and a loader bucket on the front, ideal for trenching and smaller excavations.
  • Bulldozers: Powerful machines with a large blade for pushing earth, clearing land, and leveling surfaces.
  • Skid Steers: Compact and maneuverable loaders with various attachments (buckets, forks) for digging, loading, and grading in tight spaces.
  • Trenchers: Specialized machines for digging narrow trenches for utilities.
  • Dump Trucks: Vehicles for hauling excavated material to disposal sites.
The choice of equipment depends on factors such as the type of excavation, soil conditions, site accessibility, and project budget.