Excavation Contractors North Logan

Find Land Excavation in North Logan

Get multiple Excavation Services quotes for your project today! Compare profiles, reviews, accreditations, portfolio, etc... and choose the best service.

Service Needed
City or Town
Find Pros

Over 22,076+ Excavation Companies onboarded

Our excavation pros operate in North Logan & surroundings!

ExcavationHQ has curated and vetted the Best Excavation Companies in and around North Logan. Find a top & reliable contractor today.

Frequently Asked Questions About Excavation Contractors

Find answers to common questions about excavation contractors and hiring excavation professionals in the USA.

What equipment is used for excavation?

Excavation projects employ various heavy equipment, chosen based on the job's scale and complexity. Common equipment includes:
  • Excavators: Versatile machines with a bucket, arm, and rotating cab for digging, lifting, and moving earth.
  • Backhoes: Similar to excavators but with a digging bucket on the back and a loader bucket on the front, ideal for trenching and smaller excavations.
  • Bulldozers: Powerful machines with a large blade for pushing earth, clearing land, and leveling surfaces.
  • Skid Steers: Compact and maneuverable loaders with various attachments (buckets, forks) for digging, loading, and grading in tight spaces.
  • Trenchers: Specialized machines for digging narrow trenches for utilities.
  • Dump Trucks: Vehicles for hauling excavated material to disposal sites.
The choice of equipment depends on factors such as the type of excavation, soil conditions, site accessibility, and project budget.

What should I do before excavation starts?

Prior to the start of excavation, take these essential steps:
  • Clearly Define the Scope: Outline the project's goals, including the excavation area, depth, grade, and intended use.
  • Obtain Necessary Permits: Research and acquire any required permits from your local authorities.
  • Mark Utility Lines: Contact your utility companies to locate and mark underground utilities to prevent damage.
  • Communicate with Neighbors: Inform your neighbors about the project's timeline and potential noise or disruptions.
  • Prepare the Site: Clear any obstacles, such as vegetation, furniture, or structures, from the excavation area.
  • Discuss Safety Protocols: Review safety procedures with the contractor to ensure a safe work environment.
Taking these steps helps ensure a smooth and successful excavation project.

How do I calculate how much dirt I need for fill?

To calculate the volume of dirt (fill) needed, follow these steps:
  1. Determine the Area: Measure the length and width of the area you want to fill. Multiply them to get the area in square feet (or meters).
  2. Determine the Depth: Measure the difference between the existing grade and the desired grade (how much you need to raise the ground). This is the depth of fill required.
  3. Calculate Volume: Multiply the area (step 1) by the depth (step 2) to get the volume in cubic feet (or meters).
  4. Account for Compaction: Fill dirt compacts when it settles, so add 10% to 25% to the calculated volume to account for compaction. The exact percentage depends on the type of fill material.
For complex projects or uneven terrain, consult an excavation contractor or surveyor for accurate volume calculations.

What is the difference between cut and fill excavation?

Cut and fill excavation is a technique for balancing earthwork volumes on a site:
Cut: Involves excavating soil from an area where the existing grade is higher than the desired grade.
Fill: Refers to using the excavated soil ('cut' material) to raise the grade in an area where the existing grade is lower than desired.
This method minimizes the need to import or export soil, reducing costs and environmental impact. It's commonly used for site preparation, road construction, and landscaping.

What equipment is used for excavation?

Excavation projects employ various heavy equipment, chosen based on the job's scale and complexity. Common equipment includes:
  • Excavators: Versatile machines with a bucket, arm, and rotating cab for digging, lifting, and moving earth.
  • Backhoes: Similar to excavators but with a digging bucket on the back and a loader bucket on the front, ideal for trenching and smaller excavations.
  • Bulldozers: Powerful machines with a large blade for pushing earth, clearing land, and leveling surfaces.
  • Skid Steers: Compact and maneuverable loaders with various attachments (buckets, forks) for digging, loading, and grading in tight spaces.
  • Trenchers: Specialized machines for digging narrow trenches for utilities.
  • Dump Trucks: Vehicles for hauling excavated material to disposal sites.
The choice of equipment depends on factors such as the type of excavation, soil conditions, site accessibility, and project budget.

What should I do before excavation starts?

Prior to the start of excavation, take these essential steps:
  • Clearly Define the Scope: Outline the project's goals, including the excavation area, depth, grade, and intended use.
  • Obtain Necessary Permits: Research and acquire any required permits from your local authorities.
  • Mark Utility Lines: Contact your utility companies to locate and mark underground utilities to prevent damage.
  • Communicate with Neighbors: Inform your neighbors about the project's timeline and potential noise or disruptions.
  • Prepare the Site: Clear any obstacles, such as vegetation, furniture, or structures, from the excavation area.
  • Discuss Safety Protocols: Review safety procedures with the contractor to ensure a safe work environment.
Taking these steps helps ensure a smooth and successful excavation project.

How do I calculate how much dirt I need for fill?

To calculate the volume of dirt (fill) needed, follow these steps:
  1. Determine the Area: Measure the length and width of the area you want to fill. Multiply them to get the area in square feet (or meters).
  2. Determine the Depth: Measure the difference between the existing grade and the desired grade (how much you need to raise the ground). This is the depth of fill required.
  3. Calculate Volume: Multiply the area (step 1) by the depth (step 2) to get the volume in cubic feet (or meters).
  4. Account for Compaction: Fill dirt compacts when it settles, so add 10% to 25% to the calculated volume to account for compaction. The exact percentage depends on the type of fill material.
For complex projects or uneven terrain, consult an excavation contractor or surveyor for accurate volume calculations.

What is the difference between cut and fill excavation?

Cut and fill excavation is a technique for balancing earthwork volumes on a site:
Cut: Involves excavating soil from an area where the existing grade is higher than the desired grade.
Fill: Refers to using the excavated soil ('cut' material) to raise the grade in an area where the existing grade is lower than desired.
This method minimizes the need to import or export soil, reducing costs and environmental impact. It's commonly used for site preparation, road construction, and landscaping.