Excavation Contractors Lansing

Top 10 Excavation Contractor in Lansing

Receive up to 3 Excavation Contractor quotes for your project today! Compare profiles, reviews, accreditations, portfolio, etc... and choose the best offer.

Service Needed
City or Town
Find Pros

Over 22,076+ Excavation Pros on our platform

Our excavation providers operate in Lansing & surroundings!

ExcavationHQ has curated and vetted the Best Excavation Contractors in and around Lansing. Find a trustworthy contractor today.

Frequently Asked Questions About Excavation Contractors

Find answers to common questions about excavation contractors and hiring excavation professionals in the USA.

What is the best time of year for excavation?

The ideal time for excavation can depend on your location and climate. Generally:
  • Spring and Fall: Often considered favorable due to moderate temperatures and drier soil conditions.
  • Summer: Can be suitable, but hot weather can make working conditions challenging and might require additional measures (shade, hydration) for workers.
  • Winter: Excavation in winter can be more difficult due to frozen ground, snow, and potential delays caused by inclement weather. It might also require specialized equipment or techniques.
Consult with your excavation contractor to determine the best timing for your project, considering local weather patterns and potential seasonal constraints.

Do I need a permit for excavation?

Permit requirements for excavation vary widely depending on your location and the project's specifics. Generally, permits are needed for:
  • Excavations Deeper Than a Certain Depth: This varies by jurisdiction, usually around 5 feet.
  • Excavations Near Utilities: Digging near buried utilities (gas, water, electric) often requires permits and utility locates to prevent damage.
  • Excavations Affecting Public Property: Projects impacting sidewalks, roads, or other public areas typically require permits.
  • Excavations in Environmentally Sensitive Areas: Projects in wetlands, floodplains, or other sensitive areas might need special permits.
Contact your local building department or planning authority to determine the permit requirements for your excavation project. Failure to obtain necessary permits can result in fines or project delays.

What is the difference between cut and fill excavation?

Cut and fill excavation is a technique for balancing earthwork volumes on a site:
Cut: Involves excavating soil from an area where the existing grade is higher than the desired grade.
Fill: Refers to using the excavated soil ('cut' material) to raise the grade in an area where the existing grade is lower than desired.
This method minimizes the need to import or export soil, reducing costs and environmental impact. It's commonly used for site preparation, road construction, and landscaping.

How do I know if I need excavation for my project?

Several project types often necessitate excavation:
  • New Construction: Laying foundations, basements, or underground utilities for new buildings.
  • Home Additions: Creating space for new rooms, basements, or extensions.
  • Landscaping: Leveling ground, creating slopes, installing retaining walls, or digging for ponds or pools.
  • Drainage Improvement: Installing French drains, drainage ditches, or swales to manage water runoff.
  • Utility Installation or Repair: Laying new water, sewer, gas, or electrical lines, or repairing existing ones.
  • Demolition: Clearing debris and preparing the site after demolishing a structure.
If your project involves altering the ground level or installing underground features, excavation is likely required.

What is the best time of year for excavation?

The ideal time for excavation can depend on your location and climate. Generally:
  • Spring and Fall: Often considered favorable due to moderate temperatures and drier soil conditions.
  • Summer: Can be suitable, but hot weather can make working conditions challenging and might require additional measures (shade, hydration) for workers.
  • Winter: Excavation in winter can be more difficult due to frozen ground, snow, and potential delays caused by inclement weather. It might also require specialized equipment or techniques.
Consult with your excavation contractor to determine the best timing for your project, considering local weather patterns and potential seasonal constraints.

Do I need a permit for excavation?

Permit requirements for excavation vary widely depending on your location and the project's specifics. Generally, permits are needed for:
  • Excavations Deeper Than a Certain Depth: This varies by jurisdiction, usually around 5 feet.
  • Excavations Near Utilities: Digging near buried utilities (gas, water, electric) often requires permits and utility locates to prevent damage.
  • Excavations Affecting Public Property: Projects impacting sidewalks, roads, or other public areas typically require permits.
  • Excavations in Environmentally Sensitive Areas: Projects in wetlands, floodplains, or other sensitive areas might need special permits.
Contact your local building department or planning authority to determine the permit requirements for your excavation project. Failure to obtain necessary permits can result in fines or project delays.

What is the difference between cut and fill excavation?

Cut and fill excavation is a technique for balancing earthwork volumes on a site:
Cut: Involves excavating soil from an area where the existing grade is higher than the desired grade.
Fill: Refers to using the excavated soil ('cut' material) to raise the grade in an area where the existing grade is lower than desired.
This method minimizes the need to import or export soil, reducing costs and environmental impact. It's commonly used for site preparation, road construction, and landscaping.

How do I know if I need excavation for my project?

Several project types often necessitate excavation:
  • New Construction: Laying foundations, basements, or underground utilities for new buildings.
  • Home Additions: Creating space for new rooms, basements, or extensions.
  • Landscaping: Leveling ground, creating slopes, installing retaining walls, or digging for ponds or pools.
  • Drainage Improvement: Installing French drains, drainage ditches, or swales to manage water runoff.
  • Utility Installation or Repair: Laying new water, sewer, gas, or electrical lines, or repairing existing ones.
  • Demolition: Clearing debris and preparing the site after demolishing a structure.
If your project involves altering the ground level or installing underground features, excavation is likely required.