Excavation Contractors Kewaskum

Find the best Excavation Contractors in Kewaskum

Receive up to 3 Excavation Companies quotes for your project today! Compare profiles, reviews, accreditations, portfolio, etc... and choose the best service.

Service Needed
City or Town
Find Pros

Over 22,076+ Excavation Businesses on our directory

Our excavation companies operate in Kewaskum and beyond!

ExcavationHQ has curated and vetted Top Excavation Pros in Kewaskum. Find a trustworthy contractor today.

Frequently Asked Questions About Excavation Contractors

Find answers to common questions about excavation contractors and hiring excavation professionals in the USA.

What is the difference between excavation and grading?

While often used together, excavation and grading are distinct processes:
Excavation: Primarily involves removing earth or other materials from a site. It's about digging down and creating space.
Grading: Focuses on shaping and leveling the ground to a specific slope or elevation. It's about adjusting the existing terrain.
For example, you might excavate a foundation and then grade the surrounding area to ensure proper drainage and a level surface for landscaping.

How do I calculate how much dirt I need for fill?

To calculate the volume of dirt (fill) needed, follow these steps:
  1. Determine the Area: Measure the length and width of the area you want to fill. Multiply them to get the area in square feet (or meters).
  2. Determine the Depth: Measure the difference between the existing grade and the desired grade (how much you need to raise the ground). This is the depth of fill required.
  3. Calculate Volume: Multiply the area (step 1) by the depth (step 2) to get the volume in cubic feet (or meters).
  4. Account for Compaction: Fill dirt compacts when it settles, so add 10% to 25% to the calculated volume to account for compaction. The exact percentage depends on the type of fill material.
For complex projects or uneven terrain, consult an excavation contractor or surveyor for accurate volume calculations.

How long does an excavation project take?

The duration of an excavation project varies significantly depending on factors like:
  • Project Size and Scope: Larger, more complex excavations naturally take longer.
  • Soil Conditions: Rocky or challenging soil types can slow down progress.
  • Site Accessibility: Limited access might require more time for maneuvering equipment and hauling materials.
  • Weather: Inclement weather can cause delays.
  • Permitting and Inspections: Waiting for permits or inspections can extend the timeline.
Your excavation contractor can provide a more accurate estimate after assessing your project's specifics.

How do you handle soil disposal after excavation?

Responsible soil disposal after excavation is essential. Excavation contractors typically handle it by:
  • Hauling to Designated Disposal Sites: Transporting excavated material to approved landfills or recycling centers.
  • Recycling or Reuse: If suitable, some excavated soil might be recycled for other projects or reused on-site for landscaping or backfilling.
  • Complying with Regulations: Adhering to local and environmental regulations for soil disposal to prevent contamination or illegal dumping.
Discuss disposal plans with your contractor, inquire about recycling options, and ensure they handle waste responsibly.

What is the difference between excavation and grading?

While often used together, excavation and grading are distinct processes:
Excavation: Primarily involves removing earth or other materials from a site. It's about digging down and creating space.
Grading: Focuses on shaping and leveling the ground to a specific slope or elevation. It's about adjusting the existing terrain.
For example, you might excavate a foundation and then grade the surrounding area to ensure proper drainage and a level surface for landscaping.

How do I calculate how much dirt I need for fill?

To calculate the volume of dirt (fill) needed, follow these steps:
  1. Determine the Area: Measure the length and width of the area you want to fill. Multiply them to get the area in square feet (or meters).
  2. Determine the Depth: Measure the difference between the existing grade and the desired grade (how much you need to raise the ground). This is the depth of fill required.
  3. Calculate Volume: Multiply the area (step 1) by the depth (step 2) to get the volume in cubic feet (or meters).
  4. Account for Compaction: Fill dirt compacts when it settles, so add 10% to 25% to the calculated volume to account for compaction. The exact percentage depends on the type of fill material.
For complex projects or uneven terrain, consult an excavation contractor or surveyor for accurate volume calculations.

How long does an excavation project take?

The duration of an excavation project varies significantly depending on factors like:
  • Project Size and Scope: Larger, more complex excavations naturally take longer.
  • Soil Conditions: Rocky or challenging soil types can slow down progress.
  • Site Accessibility: Limited access might require more time for maneuvering equipment and hauling materials.
  • Weather: Inclement weather can cause delays.
  • Permitting and Inspections: Waiting for permits or inspections can extend the timeline.
Your excavation contractor can provide a more accurate estimate after assessing your project's specifics.

How do you handle soil disposal after excavation?

Responsible soil disposal after excavation is essential. Excavation contractors typically handle it by:
  • Hauling to Designated Disposal Sites: Transporting excavated material to approved landfills or recycling centers.
  • Recycling or Reuse: If suitable, some excavated soil might be recycled for other projects or reused on-site for landscaping or backfilling.
  • Complying with Regulations: Adhering to local and environmental regulations for soil disposal to prevent contamination or illegal dumping.
Discuss disposal plans with your contractor, inquire about recycling options, and ensure they handle waste responsibly.