Excavation Contractors Grand Junction

Best Digging Contractors in Grand Junction

Receive multiple Excavation Company Near Me quotes for your project today! Compare profiles, reviews, accreditations, portfolio, etc... and choose the best offer.

Service Needed
City or Town
Find Pros

Over 22,076+ Excavation Companies registered

Our excavation pros operate in Grand Junction & surroundings!

ExcavationHQ has curated and vetted the Best Excavation Contractors arround Grand Junction. Find a reliable business today.

Frequently Asked Questions About Excavation Contractors

Find answers to common questions about excavation contractors and hiring excavation professionals in the USA.

How much does excavation cost?

Excavation costs in the USA vary greatly based on several factors:
  • Project Size and Scope: The larger and more complex the excavation, the higher the cost.
  • Soil Type: Different soil types require different equipment and techniques, impacting costs. Rocky or clay-rich soil can be more expensive to excavate than loose soil.
  • Accessibility: Difficult-to-access sites might require specialized equipment or additional labor, increasing expenses.
  • Disposal Costs: Hauling away excavated material (soil, rocks, etc.) to disposal sites incurs additional fees.
  • Permits and Inspections: Depending on local regulations, permits and inspections might be required, adding to the overall cost.
To get an accurate estimate, provide detailed project information to multiple excavation contractors on ExcavationHQ and compare their quotes.

What is a soil engineer, and do I need one?

A soil engineer is a professional specializing in analyzing soil properties and their behavior under various conditions. They play a crucial role in:
  • Determining Soil Suitability: Assessing whether the soil can support the intended structure or load.
  • Recommending Foundation Types: Advising on the appropriate foundation design based on soil characteristics.
  • Addressing Drainage and Erosion Issues: Providing solutions to manage water runoff and prevent erosion.
  • Evaluating Slope Stability: Assessing the risk of landslides or soil movement on slopes.
You might need a soil engineer for projects involving:
  • Building on challenging soil types (expansive clay, loose sand, etc.)
  • Constructing large or complex structures
  • Excavating near slopes or retaining walls
  • Addressing drainage or erosion concerns
Your excavation contractor or local building department can advise if a soil engineer is necessary for your project.

What is the difference between cut and fill excavation?

Cut and fill excavation is a technique for balancing earthwork volumes on a site:
Cut: Involves excavating soil from an area where the existing grade is higher than the desired grade.
Fill: Refers to using the excavated soil ('cut' material) to raise the grade in an area where the existing grade is lower than desired.
This method minimizes the need to import or export soil, reducing costs and environmental impact. It's commonly used for site preparation, road construction, and landscaping.

How do I calculate how much dirt I need for fill?

To calculate the volume of dirt (fill) needed, follow these steps:
  1. Determine the Area: Measure the length and width of the area you want to fill. Multiply them to get the area in square feet (or meters).
  2. Determine the Depth: Measure the difference between the existing grade and the desired grade (how much you need to raise the ground). This is the depth of fill required.
  3. Calculate Volume: Multiply the area (step 1) by the depth (step 2) to get the volume in cubic feet (or meters).
  4. Account for Compaction: Fill dirt compacts when it settles, so add 10% to 25% to the calculated volume to account for compaction. The exact percentage depends on the type of fill material.
For complex projects or uneven terrain, consult an excavation contractor or surveyor for accurate volume calculations.

How much does excavation cost?

Excavation costs in the USA vary greatly based on several factors:
  • Project Size and Scope: The larger and more complex the excavation, the higher the cost.
  • Soil Type: Different soil types require different equipment and techniques, impacting costs. Rocky or clay-rich soil can be more expensive to excavate than loose soil.
  • Accessibility: Difficult-to-access sites might require specialized equipment or additional labor, increasing expenses.
  • Disposal Costs: Hauling away excavated material (soil, rocks, etc.) to disposal sites incurs additional fees.
  • Permits and Inspections: Depending on local regulations, permits and inspections might be required, adding to the overall cost.
To get an accurate estimate, provide detailed project information to multiple excavation contractors on ExcavationHQ and compare their quotes.

What is a soil engineer, and do I need one?

A soil engineer is a professional specializing in analyzing soil properties and their behavior under various conditions. They play a crucial role in:
  • Determining Soil Suitability: Assessing whether the soil can support the intended structure or load.
  • Recommending Foundation Types: Advising on the appropriate foundation design based on soil characteristics.
  • Addressing Drainage and Erosion Issues: Providing solutions to manage water runoff and prevent erosion.
  • Evaluating Slope Stability: Assessing the risk of landslides or soil movement on slopes.
You might need a soil engineer for projects involving:
  • Building on challenging soil types (expansive clay, loose sand, etc.)
  • Constructing large or complex structures
  • Excavating near slopes or retaining walls
  • Addressing drainage or erosion concerns
Your excavation contractor or local building department can advise if a soil engineer is necessary for your project.

What is the difference between cut and fill excavation?

Cut and fill excavation is a technique for balancing earthwork volumes on a site:
Cut: Involves excavating soil from an area where the existing grade is higher than the desired grade.
Fill: Refers to using the excavated soil ('cut' material) to raise the grade in an area where the existing grade is lower than desired.
This method minimizes the need to import or export soil, reducing costs and environmental impact. It's commonly used for site preparation, road construction, and landscaping.

How do I calculate how much dirt I need for fill?

To calculate the volume of dirt (fill) needed, follow these steps:
  1. Determine the Area: Measure the length and width of the area you want to fill. Multiply them to get the area in square feet (or meters).
  2. Determine the Depth: Measure the difference between the existing grade and the desired grade (how much you need to raise the ground). This is the depth of fill required.
  3. Calculate Volume: Multiply the area (step 1) by the depth (step 2) to get the volume in cubic feet (or meters).
  4. Account for Compaction: Fill dirt compacts when it settles, so add 10% to 25% to the calculated volume to account for compaction. The exact percentage depends on the type of fill material.
For complex projects or uneven terrain, consult an excavation contractor or surveyor for accurate volume calculations.