Excavation Contractors Cherry Hill Mall

Top 10 Excavation Contractors in Cherry Hill Mall

Get multiple Excavation Company Near Me quotes for your project today! Compare profiles, reviews, accreditations, portfolio, etc... and choose the best deal.

Service Needed
City or Town
Find Pros

Over 22,076+ Excavation Contractors onboarded

Our excavation companies operate in Cherry Hill Mall and surrounding areas!

ExcavationHQ has curated and vetted Top Excavation Contractors arround Cherry Hill Mall. Find a top & reliable pro today.

Frequently Asked Questions About Excavation Contractors

Find answers to common questions about excavation contractors and hiring excavation professionals in the USA.

What is the best time of year for excavation?

The ideal time for excavation can depend on your location and climate. Generally:
  • Spring and Fall: Often considered favorable due to moderate temperatures and drier soil conditions.
  • Summer: Can be suitable, but hot weather can make working conditions challenging and might require additional measures (shade, hydration) for workers.
  • Winter: Excavation in winter can be more difficult due to frozen ground, snow, and potential delays caused by inclement weather. It might also require specialized equipment or techniques.
Consult with your excavation contractor to determine the best timing for your project, considering local weather patterns and potential seasonal constraints.

What is the difference between cut and fill excavation?

Cut and fill excavation is a technique for balancing earthwork volumes on a site:
Cut: Involves excavating soil from an area where the existing grade is higher than the desired grade.
Fill: Refers to using the excavated soil ('cut' material) to raise the grade in an area where the existing grade is lower than desired.
This method minimizes the need to import or export soil, reducing costs and environmental impact. It's commonly used for site preparation, road construction, and landscaping.

What are the risks associated with excavation?

Excavation, while essential for many projects, involves inherent risks, including:
  • Trench Collapses: Unstable trench walls can cave in, posing a severe risk to workers. Proper shoring and sloping are crucial safety measures.
  • Utility Damage: Striking underground utilities (gas, water, electric) can cause leaks, explosions, or electrocution. Accurate utility locates and careful digging are essential.
  • Falling Objects: Materials or equipment falling into excavations can injure workers. Securing work areas and using appropriate safety gear is vital.
  • Equipment Accidents: Operating heavy machinery involves risks of rollovers, collisions, or mechanical failures. Trained operators and proper equipment maintenance are critical.
  • Environmental Hazards: Excavated soil might contain hazardous materials (asbestos, lead). Proper testing and disposal procedures are necessary.
Reputable excavation contractors prioritize safety and have protocols to mitigate these risks.

How do I calculate how much dirt I need for fill?

To calculate the volume of dirt (fill) needed, follow these steps:
  1. Determine the Area: Measure the length and width of the area you want to fill. Multiply them to get the area in square feet (or meters).
  2. Determine the Depth: Measure the difference between the existing grade and the desired grade (how much you need to raise the ground). This is the depth of fill required.
  3. Calculate Volume: Multiply the area (step 1) by the depth (step 2) to get the volume in cubic feet (or meters).
  4. Account for Compaction: Fill dirt compacts when it settles, so add 10% to 25% to the calculated volume to account for compaction. The exact percentage depends on the type of fill material.
For complex projects or uneven terrain, consult an excavation contractor or surveyor for accurate volume calculations.

What is the best time of year for excavation?

The ideal time for excavation can depend on your location and climate. Generally:
  • Spring and Fall: Often considered favorable due to moderate temperatures and drier soil conditions.
  • Summer: Can be suitable, but hot weather can make working conditions challenging and might require additional measures (shade, hydration) for workers.
  • Winter: Excavation in winter can be more difficult due to frozen ground, snow, and potential delays caused by inclement weather. It might also require specialized equipment or techniques.
Consult with your excavation contractor to determine the best timing for your project, considering local weather patterns and potential seasonal constraints.

What is the difference between cut and fill excavation?

Cut and fill excavation is a technique for balancing earthwork volumes on a site:
Cut: Involves excavating soil from an area where the existing grade is higher than the desired grade.
Fill: Refers to using the excavated soil ('cut' material) to raise the grade in an area where the existing grade is lower than desired.
This method minimizes the need to import or export soil, reducing costs and environmental impact. It's commonly used for site preparation, road construction, and landscaping.

What are the risks associated with excavation?

Excavation, while essential for many projects, involves inherent risks, including:
  • Trench Collapses: Unstable trench walls can cave in, posing a severe risk to workers. Proper shoring and sloping are crucial safety measures.
  • Utility Damage: Striking underground utilities (gas, water, electric) can cause leaks, explosions, or electrocution. Accurate utility locates and careful digging are essential.
  • Falling Objects: Materials or equipment falling into excavations can injure workers. Securing work areas and using appropriate safety gear is vital.
  • Equipment Accidents: Operating heavy machinery involves risks of rollovers, collisions, or mechanical failures. Trained operators and proper equipment maintenance are critical.
  • Environmental Hazards: Excavated soil might contain hazardous materials (asbestos, lead). Proper testing and disposal procedures are necessary.
Reputable excavation contractors prioritize safety and have protocols to mitigate these risks.

How do I calculate how much dirt I need for fill?

To calculate the volume of dirt (fill) needed, follow these steps:
  1. Determine the Area: Measure the length and width of the area you want to fill. Multiply them to get the area in square feet (or meters).
  2. Determine the Depth: Measure the difference between the existing grade and the desired grade (how much you need to raise the ground). This is the depth of fill required.
  3. Calculate Volume: Multiply the area (step 1) by the depth (step 2) to get the volume in cubic feet (or meters).
  4. Account for Compaction: Fill dirt compacts when it settles, so add 10% to 25% to the calculated volume to account for compaction. The exact percentage depends on the type of fill material.
For complex projects or uneven terrain, consult an excavation contractor or surveyor for accurate volume calculations.